When disassembling the front fork it turned out that the crumbs on the spars were not crumbs at all but rust spots where the chrome layer already had holes. So the fork legs are scrap.
Continue reading “Front Fork”Installing Cylinder Heads, Cooling and rear Frame
For the assembly of the cylinder heads I had to order new expansion bolts and a few other small parts, these should not be reused after disassembly.
Unfortunately the copper gaskets at the nuts at the cylinder head are not according to standard, so the old gaskets were brushed off and installed again.
Continue reading “Installing Cylinder Heads, Cooling and rear Frame”Renewal of rear suspension bearings
At the rear suspension all needle bearings had to be replaced, because the old cages were full of water for years. Therefore the cages were corroded when they were removed. For the installation of the needle bushes I made a suitable bolt on the lathe to countersink the bushes so that the shoulder for the shaft seals fits exactly. The holes for the sleeves unfortunately don’t have the appropriate shoulders everywhere.
Continue reading “Renewal of rear suspension bearings”Cleaning Chassis and Swing Arm
The motorcycle frame and the rear swing arm were completely disassembled, the bearings from the swing arm will be replaced later. The frame was first cleaned with a parts cleaner and washed afterwards.
Continue reading “Cleaning Chassis and Swing Arm”Installation of Clutch and Water Pump
The clutch is now mounted, together with all the parts of the kickstarter, without any incidents. The water pump drive shaft was damaged, it was quite corroded and leaking because of the worn mechanical seal, which damaged the whole shaft afterwards.
Continue reading “Installation of Clutch and Water Pump”